AWS Substation
Transmission Structure Foundations – Fayette County, OH
Project Type
Substation
Scope of Work
Installation of Substation Piers
Key Details
- Shaft Diameters: 30″ to 60″
- Depth Range: 14′ to 36′
- Soil / Conditions: Soft Fill
- Number of Foundations: 400+
- Equipment Used: Soilmec SR-35
Photos



Henley Comstock Landslide Repair
Drilled Shaft Landslide Repair – Scioto County, OH
Project Type
Drilled Shaft Slip/Landslide Stabilization
Scope of Work
Drilled and Installed King Piles for Lagging Panel Wall
Key Details
- Shaft Diameters: 30″
- Depth Range: 40′
- Soil / Conditions: Dirt to 8,000PSI Bedrock
- Number of Foundations: 35
- Equipment Used: Soilmec SR-35
Photos



Oberlin Vine St Bridge Replacement
Bridge Foundations – Lorain County, OH
Project Type
Bridge Replacement
Scope of Work
Installation of Temporary Retaining Wall piers along with wing wall foundation shafts.
Key Details
- Shaft Diameters: 30″
- Depth Range: 40′ to 60′
- Soil / Conditions: Embankment & Shale
- Number of Foundations: 21
- Equipment Used: Soilmec SR-35
Photos